RFQ: Lake Cook Public Art Project

  • Commissioning Entity:
  • Budget: $60000
  • Open Date: 2016-04-08
  • Commissioning Location: United States
  • Geographic Eligibility:
  • Close Date: 2016-04-17

Brief Description

The selected artist/artist team (Artist) will join the City’s interdisciplinary project team (Design Team) that will convert Lake Cook, an existing fishing pond, into an extended stormwater detention facility. The Artist and the Design Team will work closely together to form a cohesive public art proposal that aligns with the Design Team’s overall design and layout of the site. The Artist will work with the Design Team to integrate public art into the Design Team’s drawings and presentations. In