Maitland I-4 Ultimate Public Art Project

  • Commissioning Entity: The City of Maitland
  • Budget: $194000
  • Open Date: 2019-11-07
  • Commissioning Location: United States
  • Geographic Eligibility: All
  • Close Date: 2019-11-11

Brief Description

One option is that the art may be located in the right-of-way areas adjacent to I-4 within the city limits of Maitland provided that the installation does not interfere with ongoing I-4 maintenance. A second option could be installed on top of the “landings” of a pedestrian bridge that is currently under construction and is just south of the Maitland/I-4 interchange. A rendering of what this bridge will look like may be viewed HERE (please be sure to click on the thumbnail images relating to the Maitland Pedestrian Bridge). PLEASE NOTE THAT NO ART MAY BE ATTACHED TO THE BRIDGE ITSELF. https://artist.callforentry.org/festivals_unique_info.php?ID=7050