RFQ: RTD I-225 Rail Line 2nd and Abilene Station

  • Commissioning Entity:
  • Budget: $100000
  • Open Date: 5/8/15
  • Commissioning Location: United States
  • Geographic Eligibility:
  • Close Date: 6/5/15

Brief Description

The preferred location for artwork at this station is on a pedestrian bridge that links the station to the parking lot. The artwork should be either along the railing of the bridge or act as a gateway at the end of the bridge. This location has considerable historical significance in the local area and the artwork should reflect that.