RFQ: Public Artwork for Louisiana Department of Transportation & Development

  • Commissioning Entity: Louisiana Department of Transportation & Development
  • Budget: $35500
  • Open Date: 2021-10-24
  • Commissioning Location: United States
  • Geographic Eligibility: Applicants in country of installation
  • Close Date: 2022-01-15

Brief Description

The goal of the selected artwork is to speak to and inform about the work being done within the DOTD. The artwork should also complement the building and surrounding space. There is potential for either a 2 OR 3-dimensional piece of permanent public work of art which could include but is not limited to murals, sculpture, site-specific sculptural installation, or a social space. Possible placement for the artwork include the concrete retaining wall on the west side of the south elevation, the southeast corner of the building, or the social gathering space within the plaza area.