RFQ: MTA Metro-North Railroad – Fulton Avenue and 3rd Avenue Bridges

  • Commissioning Entity: MTA Arts & Design
  • Budget: $125000
  • Open Date: 2019-03-21
  • Commissioning Location: United States
  • Geographic Eligibility: All
  • Close Date: 2019-04-10

Brief Description

MTA Arts & Design seeks images of artists’ previous work to review in consideration for new Percent for Art projects to be fabricated in metal materials to be determined, such as stainless steel, aluminum, or carbon steel, and replace existing fence panels. An approved fabricator will translate the final artwork design into the identified medium, therefore an artist’s prior experience, or lack thereof, with these materials will not be taken into consideration when reviewing images. The budget for design and fabrication of the artwork is approximately $125,000, including an artist fee of up to 20% of the final art project cost. As part of this fee, the selected artist will be required to submit a budget, produce completed designs, be available during the fabrication and installation of the artwork, with project managment by MTA Arts & Design.