RFQ: Montana Rapid Transit System

  • Commissioning Entity: The City of El Paso
  • Budget: $350000
  • Open Date: 06/14/2017
  • Commissioning Location: United States
  • Geographic Eligibility: All
  • Close Date: 07/07/2017

Brief Description

This public art project will commission a total of 1 or 2 artists or artist’s teams to design and develop original artistic designs and/or images to be placed on each RTS station across the length of the corridor.