Brief Description
The Tawatinâ Bridge – “Valley” in Cree – will cross the North Saskatchewan River between the east end of Louise McKinney Park on the north bank, to the south bank near Henrietta Louise Edwards Park. The bridge replaces the existing Cloverdale footbridge. The design was chosen through extensive public consultation and balances the natural aesthetics of the river valley against the desire to have a signature structure. The new structure will be a split-level bridge, incorporating a pedestrian /