RFP: Houghton Road: 22nd Street to Irvington Road

  • Commissioning Entity: City of Tucson
  • Budget: $304470
  • Open Date: 2019-03-21
  • Commissioning Location: United States
  • Geographic Eligibility: All
  • Close Date: 2019-04-15

Brief Description

The City of Tucson is seeking an artist, artist(s) or an artist team to join a multi-talented group of roadway engineering planners/designers, landscape design architects, traffic engineers, drainage engineers, plus other engineers and technical specialists engaged in geological, materials, utilities, rights-of-way and environmental work to create public art in connection with this major project work. The improvements will create a 3.0 mile six-lane regional roadway with a lot of it along very hilly terrain, with ADA compliant concrete sidewalks, bicycle paths on each side, an asphalt multi-use path, storm drainage crossing improvements, traffic signal improvements, a new northbound bridge across the Pantano Wash, a pedestrian crossing feature at Secrist Middle School, dark skies street lighting, water harvesting and native plant landscaping. Art pieces may possibly be situated at several of the roadway intersections.

  • Contact Name: Jeff DaCosta
  • Contact Email: [email protected]
  • Contact Phone: (520) 460-4506