RFP: Bike and Pedestrian Tunnel Artwork

  • Commissioning Entity:
  • Budget: $180000
  • Open Date: 2016-08-03
  • Commissioning Location: United States
  • Geographic Eligibility:
  • Close Date: 2016-08-15

Brief Description

The City of Redmond, Washington, seeks an artist or artist team (“artist”) to help the City envision an art installation that integrates into the SR 520 Grade Separation at NE 40th Street project (“project”). This project is anticipated replace the current 520 Trail at grade crossing of 40th Street with a trail tunnel that includes connections to the 520 Trail, 40th Street, and the Redmond Technology Center Pedestrian/Bicycle Bridge. The artist will deliver site-specific artwork that establi