Quarters Armature Public Art Project

  • Commissioning Entity:
  • Budget: $71225
  • Open Date: 7/2/13
  • Commissioning Location: Canada
  • Geographic Eligibility:
  • Close Date: 8/13/13

Brief Description

There are four mid block crossings along the Quarters Armature. The mid block crossings will feature granite pavers laid in a decorative pattern as well as clustered street furniture with built in undermount lighting. The selected artists may choose to install their artwork in one or two of the mid block crossings. Option #1: The artwork can be integrated into the pavement. Material selection could be but is not limited to marble, granite, concrete, etc. Methods such as sandblasting, etching,