Lambert-St. Louis International Airport

  • Commissioning Entity:
  • Budget: $65000
  • Open Date: 5/14/13
  • Commissioning Location: United States
  • Geographic Eligibility:
  • Close Date: 6/26/13

Brief Description

The City of St. Louis is seeking qualifications from artists interested in creating a site-specific permanent artwork for the Lambert-St. Louis International Airport Terminal 1 Atrium. The Atrium creates a new shared space between two levels and a focal point for passengers, with an opening measured at 18'7" x 14'6" and a fascia that is approximately 43" tall. The artwork could include (but is not limited to) the floor, the fascia, and/or the opening itself.