Client: Bayview Corporate Center
Location: Newport Beach, CA, United States
Completion date: 2011
Artwork budget: $94,000
Project Team
Architect
Sandi Warneke
Gensler
Artist
Damon Hyldreth
Industry Resource
ZFA Structural Engineers
ZFA Structural Engineers
Industry Resource
Norcal Metal Fabricators
Norcal Metal Fabricators
Overview
Post-minimal 12 x 17 foot Stainless Steel Sculpture. The sculpture commissioned for this project is in stainless steel which mirrors the stainless steel columns of the interior. At the same time it contrasts with the rectilinear forms of the interior with soaring movement.
Goals
This sculpture made the space come alive.
Process
The architect looked at the artist's work online and suggested a larger version of an existing smaller work. The artist created the new work based on his existing work, changing it to provide more drama and dynamism.