Client: Foothill Construction Authority
Location: Monrovia, CA, United States
Completion date: 2015
Artwork budget: $1,258,000
Project Team
Art Consultant
Lesley Elwood
Public Art Program Manager
Artist
Michael Davis
Arcadia Station Artist
Artist
Cha Rie Tang
Monrovia Station Artist
Artist
Andrea Myklebust
Duarte Station Artist
Artist
Stanton Sears
Irwindale Station Artist
Artist
Jose Antonio Aguirre
Azusa Downtown Station Artist
Artist
Lynn Goodpasture
APU Colleges Station Artist
Other
Tanya Patsaouras
Station Environment Coordinator
Other
Roland Genick
Parsons
Industry Resource
Damien Jackson
Parsons
Overview
The Foothill Gold Line extension is a $1.6 billion project designed to connect Pasadena to Montclair in two construction segments. This first segment between Pasadena and Azusa totals nearly $1. billion dollars and is funded by Los Angeles County’s Measure R. The 11.5-mile segment begins with the Gold Line Bridge and includes the following stations: Arcadia, Monrovia, Duarte, Irwindale, Azusa Downtown, and APU Citrus College. The Construction Authority was also charged with building a state of the art Operations Campus located between the Monrovia and Duarte stations.
Goals
Our general goal is to provide a quality well designed amenity to the community once the project is complete. We see the station artwork as a visual overlay to the standard station elements to make these spaces reflect the diverse personalities of these new destinations along the alignment. This objective is critical and we ask the artist’s to work closely with the architects, engineers and builders to achieve this goal.
Process
Our process for the collaboration begins in the way the artist is selected for the commission. Each City is asked to develop a Station Design and Art Review Committee. This group provides all the initial review and selects the final short-list and then finalist for the commission. As part of developing materials for the SDAR committee, the artist will meet with staff to review standard station plans so they may integrate their artwork into the station and the station environment. The staff includes various design professionals for the project. Each artist develops a preliminary and then an advanced design concept prior to the selection of a design/build team. For the Pasadena to Azusa phase of construction, the artist was put on to the design/build team to complete the design to 100%. They continue as a sub-contractor under the design build team during the duration of the project.
Additional Information
Our project has enjoyed tremendous support from the community. During this summer we have hosted public dedications for each station. Although this phase of the project will not be open to the public until 2016, we consistently hear how much the public appreciates the overall design of the project and it’s reflection of their own aesthetic values. Three of the city stakeholders along the alignment have commissioned their artist for additional artworks that are in public spaces adjacent to the stations. That willingness to provide extra funds is a testament to these artists’ creativity and quality of work.